Tuesday, July 21, 2009

Primary timing chain

I drove to two different shops to get the oil cooler hoses rebuilt but no success; they don't have and cannot get the fittings.
Installed a new seal for the intermediate timing chain shaft.

Prepared the areas where the seal seats (1000 grid and polishing).




Shaft in place.



The main timing chain in place.


Checked and cleaned up the oil pump.


This o ring was flat. I've replaced it with a 2-121 (I use these in DS an SM hydraulic pumps).



Monday, July 20, 2009

Shims and crankshaft

Almost done with the shims. I am just waiting fro 3 coming from Dave Burnham.
Here is the set up to grind the shim perpendicularly.
I made a little piece of metal to fit into the shim to make it easier to measure.
Ready to fit the main bearings. Some black sealer there and Clevite on the bearings.
The manual calls for grease to keep the thrust bearings in place; I used Clevite.
Just put a little sealer on the washers for the outside nuts, just to be sure...
Done.
Due to the engine stand, I have skipped this step. I will install this seal and the pilot ball bearing when I remove the engine from the stand.


The machine shop sent the crank to get balanced. The shop that did the work removed the timing gear and did not bother making a mark (I learned my lesson, next time I’ll make a mark myself). Anyway, we did not know where to press it back. We saw a mark but it was wrong. So I have put piston #1 at TDC and made a new mark. Unfortunately the O is between 2 teeth, but since I have to do the timing for each cam shaft in relation with the piston, things will work out at the end. I have engraved a new mark, which will also help the next mechanic who will work on this engine.



Thursday, July 16, 2009

Shim calculation



Worked yesterday on the valve clearance (... and polished the valve caps)










Working on the shims today...

There are so much calculation that I made a little spreadsheet to avoid errors and confusion.

Wednesday, July 15, 2009

Pistons, rings and crankshaft

I had to go back to the shop to get the timing gear pressed on the crank; they forgot to do it before returning the parts to me. They used a 40 ton press.
Fitting the rings. I saved the number on the rods to match them back to the cylinders. Everything is new so it doesn't real matter, but it was useful to cut the rings matching each cylinder. I sort my gauges on the table; much quicker and easier to work this way.




The crank was very dirty inside. Here are the new plugs...




All pistons are in place now.









Tuesday, July 14, 2009

Pistons and lapping valves

Finally the custom pistons are done and mounted on the rods (Waited 3 months for these pistons). They are 92mm instead of 91.6. There are 100 gr less that the original Maserati ones.
















The cylinders were marked and not cylindrical any more. Instead of changing the sleeves the machine shop suggested to hone them and have custom pistons made. Good idea and less expensive (But a loooong process).






A new valve.


Lapping the valves using a fuel line (See video below).





Checking for leaks. After 16 hours, the level of kerosene went down very little. Considering some evaporation, I think that the valve job was satisfactory.

Newly cut and balanced crankshaft.


The data sheet from the machine shop.


Small video on the valve job trick...

(I show the use of a drill as an option but doing it by hand is the right way to do it)





Thursday, April 16, 2009

New exhaust system

I received the stainless steel exhaust, but I am still waiting for the pistons...


Thursday, April 2, 2009

Intake valve

I have received the new intake valve.
My special tool to remove the valve: Just a piece of heating pipe with some opening I made.

Valves in place.


Checking leakage with kerosene. After 2 hours, no leakage at all. Very small leakage overnight.